Short answer
The formula
| Measure | Formula | Example |
|---|---|---|
| Planned time | Shifts × (shift length − planned breaks) | 2 × (480 − 30) = 900 min |
| Utilization | Run time ÷ planned time | 690 ÷ 900 = 76.7% |
| Calendar utilization | Run time ÷ 1,440 min (24 h) | 690 ÷ 1,440 = 47.9% |
| Idle in planned time | Planned time − run time | 900 − 690 = 210 min |
Machine utilization calculator
Change any number; the result updates as you type. The defaults are one CNC on two shifts.
Utilisation (planned time)
76.7%
Run time ÷ planned time: 690 ÷ 900 min.
- Calendar utilisation
- 47.9%
- 690 of 1,440 min in the day
- Idle in planned time
- 210 min
- Stops, setups, waiting — find the reasons
Planned vs calendar utilization: which one to use
| Planned utilization | Calendar utilization | |
|---|---|---|
| Divides run time by | Shifts the machine was scheduled for, minus breaks | All 24 hours, every day |
| Answers | Did the machine run when we planned it to? | How much of the machine's life is it working? |
| Use it for | Daily management, finding stops | Capacity: add a shift before buying a machine |
| Example | 76.7% | 47.9% |
Utilization vs OEE
Utilization stops at “was it running?”. OEE carries on: availability (much like planned utilization) × performance (did it run at the ideal cycle?) × quality (were the pieces good?). A machine can run all shift at half speed making rejects and still show high utilization. Use utilization for capacity; use OEE to find the losses inside the running time. Work an example through in the OEE calculator or the guide to calculating OEE.
Machine utilization in Excel
| Cell | Holds | Formula |
|---|---|---|
| B2 | Shifts | 2 |
| C2 | Shift length (min) | 480 |
| D2 | Breaks per shift (min) | 30 |
| E2 | Run time (min) | 690 |
| F2 | Planned time | =B2*(C2-D2) |
| G2 | Utilization | =E2/F2 (format as %) |
| H2 | Calendar utilization | =E2/1440 |
| Week | Utilization for the week | =SUM(E2:E8)/SUM(F2:F8) |
Downtime by reason, which explains the idle minutes, goes in the free downtime log template.
What a machine utilization report should show
- Utilization per machine per day, against planned time — with the idle minutes split by reason.
- The same machine week on week, so a slipping machine shows before it becomes a delivery problem.
- Calendar utilization per month for the machines you are thinking of replacing or adding a shift to.
Measured by hand, run time is the hard part. OpeEye records it per machine from the controller, a counting box or the operator’s tablet, and shows utilization live — ₹399 per machine a month.
See utilization for every machine, live.
OpeEye records run time from the machine or the operator's tablet and splits the idle time by reason. Free 15-day trial.
Questions shop owners ask
What is the machine utilization formula?
+
Machine utilization = run time ÷ available time × 100. If a machine is planned for 2 shifts of 480 minutes with 30 minutes of breaks each, it has 900 minutes available; running 690 of them is 76.7% utilization.
What is the difference between planned and calendar utilization?
+
Planned utilization divides run time by the time the machine was scheduled to work (shifts minus breaks). Calendar utilization divides by all 24 hours. The same 690 minutes of running is 76.7% of planned time but 47.9% of the calendar day — the second number tells you whether to add a shift before buying a machine.
What is a good machine utilization rate?
+
There is no single benchmark: a machine that changes jobs three times a shift can't match one running the same part all week. The useful comparison is each machine against itself, week on week, with the idle time split by reason. Against calendar time the ceiling is set by your shifts — one 8-hour shift can never exceed a third of the day.
How is machine utilization different from OEE?
+
Utilization only asks whether the machine was running. OEE also asks whether it ran at full speed and made good pieces: OEE = availability × performance × quality. A machine can show 90% utilization and 55% OEE if it runs slowly or makes rejects.
What is spindle utilization?
+
Spindle utilization counts only the time the spindle is actually cutting, not time in cycle with the spindle stopped (tool changes, probing, loading). It is read from the CNC control and is always lower than machine utilization; it shows how much of the cycle is real cutting.
How do I calculate machine utilization in Excel?
+
Put planned minutes in one column and run minutes in the next; utilization is =run/planned, formatted as a percentage. For a week, divide the sum of run time by the sum of planned time — don't average the daily percentages, or a short day counts as much as a long one.
Related
- OEE calculatorFive numbers from one shift in, OEE and its three factors out. No sign-up.
- Operator efficiency formulaThe formula, a fair version, and a calculator.
- Downtime reason codes27 reasons in 8 groups, worded for one-tap logging at the machine.
- How to calculate OEEThe formula, a worked example on a turning centre, and a calculator.